Condenser Retubing Step by Step: Tools for Each Stage of a Retube

Condenser retubing step by step: cutting, pulling, hole cleaning, inserting, rolling, leak testing and welding, with the Lanbo tools used at each stage.

Condenser Retubing Step by Step: Tools for Each Stage of a Retube

A power plant condenser can hold thousands of tubes. When erosion, corrosion or repeated leaks make plugging no longer practical, the plant replaces the whole tube bundle. A retube is a sequence of separate jobs — cut, pull, clean, insert, roll, test — and a delay at any one of them holds up the rest. Using a matched set of tools from one supplier helps keep the stages in step.

This guide walks through each stage and lists the tools Lanbo supplies for it.

Worker on scaffold inside a condenser rolling tubes

Before you start: survey and planning

Record the tube OD, wall thickness (BWG), material and length, the tubesheet thickness, the number of support plates and the tube count. Check whether the joints are rolled, or rolled and welded. These details determine cutter sizes, puller collets, expander lengths and roller torque. Plan the work so that crews on both tubesheets and in the waterboxes do not wait for each other.

Step 1: Cut the old tubes

Old tubes are cut inside the bore so they can be pulled without loading the tubesheet.

Cutting behind the tubesheet leaves a short stub in the hole that comes out with the puller, instead of a long tube that has to be forced through the full tubesheet.

Avoid hammering tubes out

Some crews drive tubes out with a demolition hammer and a collapsing tool. This can score and enlarge tubesheet holes and crack tube-to-tubesheet welds, and that damage cannot be undone. A cut-and-pull method keeps the holes in a condition that the new tubes can seal against.

Step 2: Pull the tube stubs and tubes

Hydraulic pullers grip the tube from inside and draw it out of the hole.

Screw-type heads thread into the tube; collet types grip without threading. Choose by tube material and wall thickness.

Close-up of tubesheet holes being cleaned

Step 3: Clean the tubesheet holes

Every hole must be clean before a new tube goes in. Oxide, old tube material and sealant left in the hole reduce contact between tube and tubesheet and make the joint harder to seal. Use QS-1 Tube Sheet Hole Brushes for general cleaning and the QS-2 Tube Sheet Hole Polisher to bring the surface back to bright metal. Inspect holes for scoring and measure any that look enlarged.

Step 4: Insert the new tubes

New tubes have to pass through every support plate without catching. CY-1 Tube Guides fit on the tube end (tube OD φ9.52–φ32 mm, wall 0.5–2.5 mm) and lead it through the plates. The Condenser Tube Insert helps feed long tubes in a controlled way. Keep tubes clean and capped until they are in place.

Step 5: Roll the tubes

Rolling seals each tube into the tubesheet. Torque-controlled rollers give consistent expansion from tube to tube.

Where tubes are rolled into intermediate tubesheets, the LH Series Expander reaches up to 5 m. Trim the tube ends afterwards with GXD-A / GXD-B Tube End Facing Tools.

Two technicians rolling tubes on a large tubesheet

Step 6: Leak test

Test before the waterboxes are closed. The Vacuum Joint Leak Detector (VJLD) checks individual rolled joints, and the Vacuum Tube Leak Detector checks whole tubes. Re-roll leaking joints and test again.

Step 7: Weld, where specified

For rolled-and-welded designs, tube ends can be conically expanded with TR Series Five-Roll Tapered Expanders and then welded with the WZM1-200B Orbital TIG Welder (tube OD φ12–φ51 mm, 18–40 s per joint).

Tube cleaning during service

After the retube, keep tubes clean with the GT1000 Condenser Tube Cleaner or an L-series tube cleaner.

Lanbo tools for this job

Send us the tube OD, wall, material, length and tube count, and we will put together a tool list for the full retube. Request a quote.

FAQ

Which cutter should I use to cut condenser tubes behind the tubesheet?

The DNQ-A push-type cutter cuts inside the tube just beyond the tubesheet and is driven by a tube roller. It covers tube OD φ12–φ38 mm and wall 0.3–2 mm. For cuts at a support plate, use the DNQ-B with a tube puller.

How much pull force do the YKB pullers have?

The YKB-4 and YKB-5 are rated at 6200 kgf; the YKB-6-1 and YKB-6-2 portable versions are rated at 5200 kgf. The QBG-F electric puller is rated at 4200 kgf.

Why not knock tubes out with a demolition hammer?

Hammering with a collapsing tool can score and enlarge tubesheet holes and crack existing welds. This damage cannot be repaired by rolling, so the new joints may not seal. Cutting and pulling avoids it.

What roller suits typical condenser tubes?

The SR servo system covers tube OD 6.35–38.1 mm and 0.2–77.9 N·m, which covers common condenser tube sizes. For larger or thicker tubes, the XR servo roller covers 5–300 N·m.